Petition for Adoption of tariff for 600 MW inter state Transmission System connected Wind Solar Hybrid Power Projects (SECI ISTS IX) – EQ
Petition for Adoption of tariff for 600 MW inter state Transmission System connected Wind Solar Hybrid Power Projects (SECI ISTS IX)
For more information please see below link:
tags:
600 MW Adoption of Tariff CERC hybrid power projects Inter-State REGULATIONS SECI ISTS IX Transmission System Wind-solar


