Summary: — ## **Key Decisions by the Commission** ### **1. Tariff Adoption (Approved)** – The Commission **adopted the discovered tariffs** ranging from **₹3.35/kWh to ₹3.36/kWh** for the **1,200 MW** capacity. – **Reasoning:** The tariffs are lower than previously adopted tariffs for similar hybrid projects (₹3.43–₹3.46/kWh in Petition Nos. 268/AT/2024 and 402/AT/2024), reflecting competitive market conditions. […]
Summary: — ### **1. Case Details** – **Petition No.**: 771/AT/2025 – **Subject**: Petition under **Section 63 of the Electricity Act, 2003** for **adoption of tariff** for **1200 MW Wind-Solar Hybrid Power Projects** connected to the **inter-State Transmission System (ISTS)**, selected through competitive bidding. – **Petitioner**: **NTPC Limited** – **Respondents**: **Adani Renewable Energy Holding Twelve Limited […]
Summary: — #### **1. Case Overview** * **Petition Number:** 771/AT/2025 * **Petitioner:** **NTPC Limited** * **Legal Basis:** Filed under **Section 63 of the Electricity Act, 2003**. This section deals with the adoption of tariff discovered through a transparent process of competitive bidding. * **Subject:** The petition seeks the **adoption of tariff** for **1200 MW Wind-Solar […]
Summary: — ### **1. Background** **NTPC Limited (NTPCL)** filed a petition before the **Central Electricity Regulatory Commission (CERC)** under **Section 63 of the Electricity Act, 2003** seeking **adoption of tariff** for **1200 MW Wind-Solar Hybrid Power Projects**, with a **Greenshoe Option** for an additional capacity of up to **600 MW**. The projects are connected to […]
Petition for Adoption of Tariff of 1.2 GW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India basis with ‘Green- Shoe Option” For more information please see below link:
Petition for Adoption of Tariff of 1.2 GW ISTS Grid connected Wind – Solar Hybrid Power projects with ‘Green-Shoe Option” under by Ministry of Power, Govt. of India For more information please see below link:
Petition for Adoption of tariff for 600 MW inter state Transmission System connected Wind Solar Hybrid Power Projects (SECI ISTS IX) For more information please see below link: