Featured December 24, 2021 Anand Gupta 0 JERC Issue NOTICE FOR PRE-BID MEETING – EQ Mag Pro 0 0 0 00 0 0 more now viewing JERC Issue NOTICE FOR PRE-BID MEETING – EQ Mag Pro December 24, 2021 Anand Gupta now playing Petition for Adoption of Transmission Charges with respect to the Transmission System being established by the Davanagere Power Transmission Limited - EQ December 24, 2021 Anand Gupta now playing Petition of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for determination of transmission tariff for 2014-19 tariff period - EQ December 24, 2021 Anand Gupta now playing Petition for Truing up and determination of the transmission tariff for Double Circuit Purnea-Muzaffarpur and Muzaffarpur (PGCIL)-Muzaffarpur (BSEB) Transmission Line, in the Eastern Region and the Northern Region associated with Tala HEP of Powerlinks Transmission Limited - EQ December 24, 2021 Anand Gupta now playing NECTAR issue Tender for NIT for Solar Work in the Industrial Shed in Umsiang Maiong Village, Ri Bhoi - EQ December 24, 2021 Anand Gupta now playing CPT issue Tender for DSITC of 2 MWp Grid Connected Roof top Solar PV Project on the 4 Nos. Exim Godowns at Chennai Port Authority under RESCO Model - EQ December 24, 2021 Anand Gupta now playing India’s Non-Fossil Power Generation Share Rises Toward One-Third Milestone - EQ December 24, 2021 Anand Gupta now playing MNRE in 2025: Batteries Emerge as the Missing Link in India’s Renewable Energy Transition - EQ December 24, 2021 Anand Gupta now playing India to Require 230 GWh of Energy Storage by 2030 to Stabilise Grid with 254 GW Renewables - EQ December 24, 2021 Anand Gupta now playing India Reclaims Position as World’s Third-Largest Wind Market in 2025: BNEF - EQ December 24, 2021 Anand Gupta now playing Adani Clean Energy Businesses Achieve Milestone Year as Solar, Wind and Green Hydrogen Scale Up - EQ December 24, 2021 Anand Gupta JERC Issue NOTICE FOR PRE-BID MEETING. For more information please see below link: Download [539.55 KB] Related posts: Notice For Pre-Bid Meeting on 27th July’ 2021 JERC Net Metering Regulations for Goa & UT’s GENERIC TARIFF ORDER FOR RENEWABLE ENERGY SOURCES FOR FY 2019-2020 MNRE Issues Notice to SECI on ALMM Implementation Clarification tags: JERC NOTICE Pre-Bid Meeting 0 00 0 0 previous SEB’s Green Bond Report: 2022 Transition and Sustainable Financing Outlooks next SEB’s Green Bond Report: 2022 Transition and Sustainable Financing Outlooks - EQ Mag Pro Anand Gupta Editor - EQ Int'l Media Network Related Posts 2025 India Market Annual Review — Advancing Grid-Connected Residential and Commercial Energy Solutions – EQ December 24, 2025 Anand Gupta 0 In the matter of Seeking exemption from having dedicated feeder for availing open access for Solar PV power of CSERC (Connectivity and Intra-State Open Access) Regulations – EQ December 23, 2025 Anand Gupta 0 Chhattisgarh’s Solar Shift: State Commission Unlocks Green Power for Industry with Landmark Open Access Waiver – EQ December 23, 2025 Anand Gupta 0