Petition for Adoption of tariff for 170 MW grid connected solar PV power project as per the Guidelines for Tariff Based Competitive Bidding Process – EQ
Summary:
—
## **1. Parties**
### **Petitioners:**
**Rewa Ultra Mega Solar Limited (RUMSL) & Another**
### **Respondent:**
**Waaree Forever Energies Private Limited (WFEPL)**
—
## **2. Subject of Petition**
Petition under **Section 63 of the Electricity Act, 2003** seeking:
> **Adoption of tariff** for a **170 MW grid-connected solar PV project** selected through a **tariff-based competitive bidding process** (as per Solar Bidding Guidelines dated 28 July 2023 and amendments).
—
## **3. Proceedings on 04.11.2025**
* The matter had been **partly heard earlier**.
* On this date, the **Coram that earlier heard the matter was not available**.
* Due to the change in Coram, **the hearing could not proceed**.
—
## **4. Order**
* The matter was **adjourned**.
* The Commission directed that the case will next be **listed for hearing on 09 December 2025**.
—
For more information please see below link:
Related posts:
- Petition for Adoption of tariff for the 170 MW grid connected solar PV power project for Procurement of Power from Grid Connected Solar PV Power Projects – EQ
- Petition of the Electricity Act with the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Wind Power Projects – EQ
- Petition with the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Wind Power Projects – EQ
- Petition for Adoption of Tariff of 1.2 GW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India basis with ‘Green- Shoe Option” – EQ


