1. Home
  2. Anand Gupta

Anand Gupta

Editor - EQ Int'l Media Network

Emmvee Photovoltaic Power Secures SEBI Nod for ₹3,000 Crore IPO to Drive Solar Expansion – EQ

In Short : Emmvee Photovoltaic Power has received SEBI’s approval for a ₹3,000 crore IPO. The solar module maker plans to channel the funds into expanding manufacturing capacity, scaling renewable energy initiatives, and cutting debt. The move strengthens Emmvee’s market position while contributing to India’s clean energy transition and push for self-reliance in solar manufacturing […]

Drat GERC (Terms & CondiGons for Green Energy Open Access) (Third Amendment) RegulaGons, 2025 – EQ

Summary: — ## 📌 Context * **Issuing Body:** Gujarat Electricity Regulatory Commission (GERC) * **Document:** Draft (Third Amendment) to the *GERC Terms & Conditions for Green Energy Open Access Regulations, 2024*. * **Date:** 30th August 2025 * **Jurisdiction:** Entire state of Gujarat — ## ⚡ Key Amendments 1. **Regulation 1(4) – Banking Charges Applicability** * […]

OM regarding extension in timeline of the Solar Park scheme – EQ

OM regarding extension in timeline of the Solar Park scheme For more information please see below link:

As part of Seva Pakhwada, Union Environment Minister leads Tree Plantation Drive under ‘Ek Ped Maa Ke Naam’ Campaign in New Delhi – EQ

In Short : As part of Seva Pakhwada, the Union Environment Minister led a tree plantation drive in New Delhi under the ‘Ek Ped Maa Ke Naam’ campaign. The initiative emphasizes environmental conservation and community involvement, encouraging people to plant trees in honor of their mothers. It aims to strengthen India’s green movement, promote sustainability, […]

Serentica Renewables Signs 100 MW RTC Power PPA with SECI – EQ

Mumbai – Serentica Renewables, a leading renewable energy company in India, has signed a landmark Power Purchase Agreement (PPA) with the Solar Energy Corporation of India (SECI) for 100 MW of round-the-clock renewable power. This marks India’s first-ever “load-following” PPA, designed in coordination with SECI and state DISCOMs to match the seasonal load profile of […]

Growatt WIT Series 50–100 kW — Industrial-grade Backup & Hybrid Power for India’s C&I Sector – EQ

As India’s commercial and industrial (C&I) businesses push for higher uptime and lower operating cost, Growatt introduces the WIT Series 3-phase inverters (WIT_50-100K_HU and WIT_50-100K_AU) — a rugged, scalable platform built specifically to keep factories, cold-stores, warehouses and campuses running, even when the grid doesn’t. The WIT family combines enterprise-level backup (UPS + black-start), diesel-generator […]

Petition of the CERC (Open Access in inter-State Transmission) Regulations for 19.2 MW capacity and grant the timelines stipulated – EQ

Summary: ### **1. Project Details** * [cite_start]**Scope:** The petition was filed under the Electricity Act, 2003, and the CERC (Open Access in inter-State Transmission) Regulations, 2008[cite: 196]. [cite_start]It relates to the alleged arbitrary, unlawful, and mala fide acts by the Respondent, KPTCL, in refusing to process and grant the Petitioner’s application for Short Term Open […]

Petition for determination of the transmission tariff for evacuation of power from Solar Energy Zones in Rajasthan (8.1GW) under Phase-II-Part F1 – EQ

Summary: ### **1. Project Details** * [cite_start]**Petition No. 285/TT/2024:** This petition is for the determination of the transmission tariff from the Commercial Operation Date (COD) to March 31, 2024, for assets under the “Transmission System Strengthening Scheme for evacuation of power from Solar Energy Zones in Rajasthan (8.1GW) under Phase-II-Part F1″[cite: 3, 4]. * [cite_start]**Petition […]

Petition for Truing up and determination of transmission tariff for North Eastern Region implemented by the North East Transmission Company Limited – EQ

Summary: Organisation: Central Electricity Regulatory Commission (CERC) Petition No.: 383/TT/2025 Subject: Petition for truing up of transmission tariff for the 2019-24 period and determination of transmission tariff for the 2024-29 period. Project: “400 kV Palatana-Bongaigaon Transmission System Project” in the North Eastern Region. Petitioner: North East Transmission Company Limited (NETCL) Respondents: Power Grid Corporation of […]

CPWD issue Tender for SITC of roof top solar system with capacity in the IMU Chennai and VOC Hostel, campus Uthandi Chennai – EQ

CPWD issue Tender for SITC of roof top solar system with capacity in the IMU Chennai and VOC Hostel, campus Uthandi Chennai For more information please see below link: Tender Details : Tender Title : 54/CE/EE(E)/CHENNAI-1/2025-26/CPWD/CHN/RECALL Tender Reference Number : 54/CE/EE(E)/CHENNAI-1/2025-26/CPWD/CHN/RECALL Tender Type : Open/Advertised Tender Category : Works Product Category : Multi-crop Thresher Product […]