Breaking News : 40% of Renewable Generation Obligation made applicable on all thermal power plants (except CPPs) commissioned on or after 1st April 2023 – EQ Mag
0
0
Breaking News : 40% of Renewable Generation Obligation made applicable on all thermal power plants (except CPPs) commissioned on or after 1st April 2023.
For more information please see below link:
Related posts:
- Supply of Fly ash to the end users by the Thermal Power Plants plants to increase fly ash utilization – EQ Mag Pro
- Supply of Ash to the prospective user agencies as stipulated in the MoEF&CC Notification dated 31.12.2021 by the power plants to increase Ash utilization generated by Thermal Power Plants (TPPs) – reg – EQ Mag Pro
- Breaking News : NATIONAL CARBON MARKET – EQ Mag Pro
- Breaking News : Flexibility in thermal & hydro power generation through bundling with RE – EQ Mag Pro