Featured December 25, 2019 Anand Gupta 0 Curtailment of Power from Renewable Energy based generating Stations – reg. 0 00 0 0 more now viewing Curtailment of Power from Renewable Energy based generating Stations – reg. December 25, 2019 Anand Gupta now playing NTPC Ltd issue Tender for Supply of Solar PV Modules for 1.2 GW Solar PV Projects at NTPC Rel Khavda RE Park-South Block in Rann of Kutch Gujarat - EQ December 25, 2019 Anand Gupta now playing NTPC Ltd issue Tender for Supply and Installation of SVG Package for Reactive Power Compensation at Devikot Solar PV Station - EQ December 25, 2019 Anand Gupta now playing CPWD issue Tender for SITC of Grid Connected Rooftop Solar Power Plant at Composite Regional Centre (CRC) Rajnandgaon (C.G.) - EQ December 25, 2019 Anand Gupta now playing How governments can best support consumers during this energy crisis - EQ December 25, 2019 Anand Gupta now playing Avaada Group Surpasses 17.7 GWp Renewable Portfolio; Over 7.2 GWp Operational and ~ 10.5 GWp Under Construction - EQ December 25, 2019 Anand Gupta now playing Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation - EQ December 25, 2019 Anand Gupta now playing Petition of the CERC (Conduction of Business) Regulations for Bihar State Power Holding Company Limited and PTC India Limited - EQ December 25, 2019 Anand Gupta now playing Petition of the CERC (Procedure, Terms and Conditions for Grant of Trading Licence and other Related Matters) Regulations, 2020 - EQ December 25, 2019 Anand Gupta now playing CB issue Tender for Supply and Installation of Solar Power System - EQ December 25, 2019 Anand Gupta now playing PIXON Receives ALMM Approval for 2.391 GW Solar Module Manufacturing Capacity - EQ December 25, 2019 Anand Gupta Curtailment of Power from Renewable Energy based generating Stations – reg. For more information please see below link: 00 0 0 previous Cabinet approves MoU between India and Saudi Arabia for cooperation in the field of Renewable Energy next NTPC to invest Rs 50,000 crore to add 10GW solar energy capacity by 2022 Anand Gupta Editor - EQ Int'l Media Network Related Posts How governments can best support consumers during this energy crisis – EQ May 8, 2026 Anand Gupta 0 Avaada Group Surpasses 17.7 GWp Renewable Portfolio; Over 7.2 GWp Operational and ~ 10.5 GWp Under Construction – EQ May 8, 2026 Anand Gupta 0 PIXON Receives ALMM Approval for 2.391 GW Solar Module Manufacturing Capacity – EQ May 6, 2026 Anand Gupta 0 LEAVE YOUR COMMENT Cancel replyYour email address will not be published. Required fields are marked *