IN THE MATTER OF: Petition of the HERC (T&C for grant of connectivity and open access for intra-state transmission and distribution system) Regulations 2012
IN THE MATTER OF: Petition under Reg. 53 of the HERC (Terms and Conditions for grant of connectivity and open access for intra-state transmission and distribution system) Regulations 2012
For more information please see below link:
tags:
HERC



