Maharashtra Floats Tender For 56 KW Solar PV Plant
GRID-CONNECTED SOLAR PV POWER PLANT WITH FULL LOAD BATTERY BACK UP (HYBRID SYSTEM) FOR 4 HRS UNDER ROOF-TOP NET METERING WITH CAPACITY OF 8 KW, AT EACH PRIMARY HEALTH CENTER AND TOTAL 56 KW FOR 7 NOS OF PRIMARY HEALTH CENTER IN WARDHA DISTRICT
For more information please see below link:



