MYT Petition for determination and approval of tariff of PPCL Gas Power Station (32.5 MW) for the period 2022-23 to 2024-25 along with Annual Performance Review for the FY 2021-22 – EQ Mag Pro
MYT Petition for determination and approval of tariff of PPCL Gas Power Station (32.5 MW) for the period 2022-23 to 2024-25 along with Annual Performance Review for the FY 2021-22.
For more information please see below link:




