1. Home
  2. India
  3. NTPC announced the commercial operation of 1st part of 56 MW Kawas Solar PV Project – EQ Mag Pro
NTPC announced the commercial operation of 1st part of 56 MW Kawas Solar PV Project – EQ Mag Pro

NTPC announced the commercial operation of 1st part of 56 MW Kawas Solar PV Project – EQ Mag Pro

0
0

With this, the standalone installed and commercial capacity of NTPC has become 54616.68 MW.

New Delhi: NTPC declares the Commercial Operation of the first part capacity of 20 MW out of 56 MW Kawas Solar PV Project on 14.05.2022.

With this, the standalone installed and commercial capacity of NTPC has become 54616.68 MW. Further, the group installed and commercial capacity of NTPC has become 68981.68 and 68321.68 MW respectively

Source: psuconnect
Anand Gupta Editor - EQ Int'l Media Network