Tenders May 15, 2019 Anand Gupta 0 PCM based Solar Drier 13 0 13 00 0 0 more now viewing PCM based Solar Drier May 15, 2019 Anand Gupta now playing In the matter of the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to Angul Sundargarh Transmission Ltd. - EQ May 15, 2019 Anand Gupta now playing Inviting Suggestions and Objections of the Public and Stakeholders on proposed amendments in PSERC (Terms and Conditions for Intra-state Open Access) (13th Amendment) Regulations, 2026 - EQ May 15, 2019 Anand Gupta now playing Inviting comments/suggestions/objections on Draft DERC (Terms and Conditions for Green Energy Open Access) (First Amendment) Regulations, 2026 - EQ May 15, 2019 Anand Gupta now playing SECI issue Tender for Selection of WPD for Setting up of 1.2 GW ISTS-connected Wind Power Projects (SECI-Tranche-XX) - EQ May 15, 2019 Anand Gupta now playing NHPC Ltd issue Tender for EPC Contract for Setting up of 7.8 MW plus Wind Power Project in Agali, Distt Palakkad ,Kerala with Comprehensive O&M of 5 years - EQ May 15, 2019 Anand Gupta now playing Extension of Inter-State Transmission charges waiver on transmission of the electricity generated from solar and wind sources of energy, for the RE projects delayed due to delay in readiness of transmission infrastructure -reg. - EQ May 15, 2019 Anand Gupta now playing Local Sourcing Push May Trigger Solar Cell Shortage in India from June - EQ May 15, 2019 Anand Gupta now playing City Accelerator Drives Rooftop Solar Adoption Across Urban India - EQ May 15, 2019 Anand Gupta now playing Real-Time Rooftop Solar Tracking Portal Set to Transform Transparency and Execution - EQ May 15, 2019 Anand Gupta now playing Suzlon–GS E&C Alliance Signals New Phase of Global Collaboration in India’s Renewable Energy Market - EQ May 15, 2019 Anand Gupta PCM based Solar Drier For more information please see below link: Related posts: PCM based Solar Drier PCM based Solar Drier Solar Tunnel Driver Supply of Solar Dryer tags: Department of Agricultural Research and Education PCM based Solar Drier 13 00 0 0 previous PROVN OF SOLAR LANTERS AND BLANKET TO THE NEEDY AND DESTITUTE VILLAGERS IN AOR next ENGINEERING, PROCUREMENT, CONSTRUCTION AND 1 YEAR FREE COMPREHENSIVE OPERATION, MAINTENANCE OF ON GRID ROOF MOUNTED CAPTIVE SOLAR POWER PLANT Anand Gupta Editor - EQ Int'l Media Network Related Posts SECI issue Tender for Selection of WPD for Setting up of 1.2 GW ISTS-connected Wind Power Projects (SECI-Tranche-XX) – EQ April 22, 2026 Anand Gupta 0 NHPC Ltd issue Tender for EPC Contract for Setting up of 7.8 MW plus Wind Power Project in Agali, Distt Palakkad ,Kerala with Comprehensive O&M of 5 years – EQ April 22, 2026 Anand Gupta 0 SECI issue Tender for 4.5 MW of Rooftop Solar Projects across India – EQ April 21, 2026 Anand Gupta 0 LEAVE YOUR COMMENT Cancel replyYour email address will not be published. Required fields are marked *