Petition Adoption of Usage Charges for 1000 MW Solar PV Power Station (Tranche-III) Connected to the ISTS by the Central Government – EQ
0
0
Petition Adoption of Usage Charges for 1000 MW Solar PV Power Station (Tranche-III) Connected to the ISTS by the Central Government
For more information please see below link:
Related posts:
- Petition for Adoption of Tariff for the ISTS Grid connected Solar PV projects of 2400 MW including capacity of 1200 MW with “Greenshoe Option” by Ministry of Power – EQ
- Petition for Adoption of Tariff for the ISTS Grid connected 1400 MW Renewable Energy Power Projects coupled with Energy Storage System – EQ
- Petition for the Adoption of the tariff of Solar PV Power Projects (Tranche xviii) connected to the inter-state transmission system (ISTS) – EQ
- Petition for Adoption of the Usage Charges for 1200 MW Solar PV Power Station (Tranche-Ill) Connected to the ISTS/STU under Central Power Sector undertaking Scheme Phase-ll – EQ
tags:
1000 MW ADOPTION CERC REGULATIONS Solar PV power station the Central Government the ISTS Tranche-III Connected


