![Petition filed by M/s World Wide Iron and Steel Industries Private Limited for additional power allocation of 1000 kVA – EQ Mag Pro](https://www.eqmagpro.com/wp-content/uploads/2020/02/KSERC-Renewable-Energy-and-Net-Metering-Regulations-2020.jpg)
Petition filed by M/s World Wide Iron and Steel Industries Private Limited for additional power allocation of 1000 kVA – EQ Mag Pro
0
0
Petition filed by M/s World Wide Iron and Steel Industries Private Limited for additional power allocation of 1000 kVA.
For more information please see below link:
Related posts:
- Petition Seeking Interim Order For Approval For Procurement of 200 MW Solar Power From Inter State Transmission System Grid Connected – EQ Mag Pro
- Petition in the matter of determination of Generic Tariff for Electricity generated from Municipal Solid Waste (MSW) to energy Projects – EQ Mag Pro
- Petition seeking approval for procuring 270 MW RTC power on medium term basis – EQ Mag Pro
- Petition filed by M/s NTPC Ltd seeking for a direction to the respondent KSEB Ltd to sign the final Power Purchase Agreement as per Order of this Commission – EQ Mag Pro
tags:
additional power allocation of 1000 kVA KSERC Petition World Wide Iron and Steel Industries Private Limited