Petition for Adoption for 1000 MW Solar PV Power Station (Tranche-III) Connected to the ISTS under Central Power Sector Undertaking Scheme Phase-II – EQ
0
0
Petition for Adoption for 1000 MW Solar PV Power Station (Tranche-III) Connected to the ISTS under Central Power Sector Undertaking Scheme Phase-II
For more information please see below link:
Related posts:
- Petition for Adoption of tariff for 2100 MW from ISTS connected RE Power Projects coupled with Energy Storage System – EQ
- Petition for Adoption of the Usage Charges for 1200 MW Solar PV Power Station (Tranche-Ill) Connected to the ISTS/STU under Central Power Sector undertaking Scheme Phase-ll – EQ
- Petition Adoption of Usage Charges for 1000 MW Solar PV Power Station (Tranche-III) Connected to the ISTS by the Central Government – EQ
- Petition of Adoption of usage charges for 510 MW Solar PV Power Station (Tranche-III) connected to the Inter-State Transmission System as per the Standard Bidding Guidelines of MoP – EQ
tags:
1000 MW ADOPTION Central Power Sector CERC ists Power Station Tranche-III REGULATIONS Scheme Phase-II SOLAR PV


