Petition for adoption of tariff for 600 MW Solar Power Projects (Tranche VIII) connected to the Inter-State Transmission System (ISTS) – EQ
Petition for adoption of tariff for 600 MW Solar Power Projects (Tranche VIII) connected to the Inter-State Transmission System (ISTS)
For more information please see below link:
