Petition for adoption of tariff for 900 MW Wind Solar Hybrid Power Projects (Tranche VII) connected to the Inter-State Transmission System and selected through a competitive bidding process – EQ
Petition for adoption of tariff for 900 MW Wind Solar Hybrid Power Projects (Tranche VII) connected to the Inter-State Transmission System and selected through a competitive bidding process
For more information please see below link:


