Petition for adoption of tariff for the 2000 MW Solar Power Projects (Tranche-IX) connected to the Inter-State Transmission System (ISTS) and selected through Competitive Bidding Process – EQ Mag Pro
Petition for adoption of tariff for the 2000 MW Solar Power Projects (Tranche-IX) connected to the Inter-State Transmission System (ISTS) and selected through Competitive Bidding Process.
For more information please see below link:





