Petition For adoption of tariff for the Scheme for setting up of 1000 MW inter-State Transmission System connected Wind Power
Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for the Scheme for setting up of 1000 MW inter-State Transmission System connected Wind Power selected through competitive bidding process as per the Guidelines issued by Ministry of New Renewable Energy on 14.6.2016 and 22.10.2016
For more information please see below link:



