Petition for adoption of tariff of 600 MW Wind Power Projects (Tranche XIII) connected to the inter-State Transmission System (ISTS) and selected through Competitive Bidding Process – EQ
Petition for adoption of tariff of 600 MW Wind Power Projects (Tranche XIII) connected to the inter-State Transmission System (ISTS) and selected through Competitive Bidding Process.
For more information please see below link:
