1. Home
  2. Policy & Regulation
  3. Petition for adoption of tariff of 600 MW Wind Power Projects (Tranche XIII) connected to the inter-State Transmission System (ISTS) and selected through Competitive Bidding Process – EQ
Petition for adoption of tariff of 600 MW Wind Power Projects (Tranche XIII) connected to the inter-State Transmission System (ISTS) and selected through Competitive Bidding Process – EQ

Petition for adoption of tariff of 600 MW Wind Power Projects (Tranche XIII) connected to the inter-State Transmission System (ISTS) and selected through Competitive Bidding Process – EQ

0

Petition for adoption of tariff of 600 MW Wind Power Projects (Tranche XIII) connected to the inter-State Transmission System (ISTS) and selected through Competitive Bidding Process.

For more information please see below link:

Anand Gupta Editor - EQ Int'l Media Network