Petition for Adoption of Transmission Charges to the Transmission System being established by the Khavda PS1 and 3 Transmission Limited – EQ
Petition for Adoption of Transmission Charges to the Transmission System being established by the Khavda PS1 and 3 Transmission Limited
For more information please see below link:
tags:
ADOPTION CERC REGULATIONS the Khavda PS1 and 3 Transmission Limited transmission charges Transmission System
