1. Home
  2. Policy & Regulation
  3. Petition for approval of tariff of Barauni Thermal Power Station Stage – II (2×250 MW) for the period from the COD of Unit-8 (Unit#1 of stage-II) i.e. 01.03.2020 to 31.03.2024. NTPC Limited – EQ
Petition for approval of tariff of Barauni Thermal Power Station Stage – II (2×250 MW) for the period from the COD of Unit-8 (Unit#1 of stage-II) i.e. 01.03.2020 to 31.03.2024. NTPC Limited – EQ

Petition for approval of tariff of Barauni Thermal Power Station Stage – II (2×250 MW) for the period from the COD of Unit-8 (Unit#1 of stage-II) i.e. 01.03.2020 to 31.03.2024. NTPC Limited – EQ

0
0
Anand Gupta Editor - EQ Int'l Media Network