Petition for approval of tariff of Rampur Hydro Power Station (412 MW) for the period from 1.4.2019 to 31.3.2024 SJVN Limited – EQ Mag Pro
Petition for approval of tariff of Rampur Hydro Power Station (412 MW) for the period from 1.4.2019 to 31.3.2024 SJVN Limited.
For more information please see below link:





