Petition for determination of tariff of Rihand Super Thermal Power Station Stage-I (1000 MW) for the period 2019-24. NTPC Limited – EQ
Petition for determination of tariff of Rihand Super Thermal Power Station Stage-I (1000 MW) for the period 2019-24. NTPC Limited
For more information please see below link:
