Petition for determination of transmission tariff from the COD to System Strengthening Scheme in the Northern Region–XXXVII (NRSS-XXXVII) – EQ
Summary:
—
**Case Details**
– **Petition No:** 330/TT/2023
– **Subject:** Determination of transmission tariff from the Commercial Operation Date (COD) to 31.03.2024 for three assets under the *System Strengthening Scheme in the Northern Region–XXXXII (NRSS-XXXVII)*
– **Petitioner:** Power Grid Corporation of India Limited (PGCIL)
– **Respondents:** Power Transmission Corporation of Uttarakhand Limited (PTCUL) and 15 others
– **Date of Hearing:** 27.11.2025
– **Bench:** Chairperson Shri Jishnu Barua and three Members
—
### **Key Arguments**
#### **From PGCIL (Petitioner):**
– Pleadings are complete; requested final tariff approval.
– Argued that PTCUL was aware of all facts and PGCIL is eligible for approval of COD for Asset-2 under **Regulation 5(2) of the 2019 Tariff Regulations**.
#### **From PTCUL (Respondent):**
– Contended that there was **no agreed Project Implementation Schedule** between PGCIL and PTCUL.
– Argued that PTCUL should **not be liable for transmission charges** during the mismatch period.
– Stated that PGCIL did not respond to its letters regarding non-requirement of the assets.
—
**Commission’s Direction**
1. Both parties to file **notes of argument / written submissions** within a week, with copies to each other.
2. The Commission **reserved its order** in the matter, subject to receipt of written submissions.
—