Petition For Interim Relief For Allowing the Petitioner to Inject 3.5 MW Power Generated From Its Slop

Petition For Interim Relief For Allowing the Petitioner to Inject 3.5 MW Power Generated From Its Slop

0

Petition for Interim Relief for allowing the petitioner to inject 3.5 MW power generated from its Slop based generating plant to the grid of the Discom on provisional basis subject to the final disposal of the petition in Petition no 1708/2021.

For more information please see below link: