Petition for revision of tariff of Muzaffarpur Thermal Power Station Stage-I (220 MW) after the truing up exercise for the period from 1.4.2014 to 31.3.2019 KBUNL – EQ
Petition for revision of tariff of Muzaffarpur Thermal Power Station Stage-I (220 MW) after the truing up exercise for the period from 1.4.2014 to 31.3.2019 KBUNL
For more information please see below link:


