Petition for the development of 300 MW ISTS connected Wind-Solar Hybrid power project, entered between AHEJTL and SECI – EQ
Petition for the development of 300 MW ISTS connected Wind-Solar Hybrid power project, entered between AHEJTL and SECI
For more information please see below link:


