Petition for Truing up and determination of the transmission tariff period for asset at Meerut and Moga under Northern Region System Strengthening Scheme-XXVI – EQ
Petition for Truing up and determination of the transmission tariff period for asset at Meerut and Moga under Northern Region System Strengthening Scheme-XXVI
For more information please see below link:
tags:
CERC determination Meerut and Moga Northern Region REGULATIONS System Strengthening Scheme-XXVI transmission tariff period Truing up


