Petition for truing up of annual fixed charges for the 2014-19 tariff period in respect of Feroze Gandhi Unchahar Thermal Power Station Stage-IV (500 MW) NTPC Limited – EQ Mag Pro
Petition for truing up of annual fixed charges for the 2014-19 tariff period in respect of Feroze Gandhi Unchahar Thermal Power Station Stage-IV (500 MW) NTPC Limited.

For more information please see below link:



