Petition of the CERC (Conduct of Business) Regulations of RE Power Developers for Supply of 1500 MW Firm and Dispatchable Power from ISTS-Connected Renewable Energy Power Projects – EQ
0
0
Petition of the CERC (Conduct of Business) Regulations of RE Power Developers for Supply of 1500 MW Firm and Dispatchable Power from ISTS-Connected Renewable Energy Power Projects
For more information please see below link:
Related posts:
- Petition for Adoption of tariff for 200 MW capacity awarded from ISTS connected Renewable Energy Power Projects (SECI FDRE VI) by the Ministry of Power, Govt. of India – EQ
- Petition for Adoption of Tariff for procurement of power from the 760 MW Firm and Dispatchable Power (Assured Peak Power Supply) from ISTS-Connected Renewable Energy Power Projects – EQ
- Petition of the CERC (Terms and Conditions of Tariff determination from Renewable Energy Sources) and (Conduct of Business) Regulations Tariff for 50 MW of NTPC Limited – EQ
- Petition for Adoption of Tariff for the ISTS Grid connected 1400 MW Renewable Energy Power Projects coupled with Energy Storage System – EQ
tags:
1500 MW CERC Conduct of Business Dispatchable Power ISTS-CONNECTED power projects RE Power Developers REGULATIONS Renewable Energy