Petition for Adoption of Tariff for procurement of power from the 760 MW Firm and Dispatchable Power (Assured Peak Power Supply) from ISTS-Connected Renewable Energy Power Projects – EQ
Petition for Adoption of Tariff for procurement of power from the 760 MW Firm and Dispatchable Power (Assured Peak Power Supply) from ISTS-Connected Renewable Energy Power Projects
For more information please see below link:
tags:
760 MW Adoption of Tariff Assured Peak Power Supply CERC ISTS-CONNECTED power projects procurement of power REGULATIONS Renewable Energy


