Petition of the GERC of grid connectivity and commissioning of 7.8 MW solar plant for captive use due to occurrence of uncontrollable events – EQ
Petition of the GERC of grid connectivity and commissioning of 7.8 MW solar plant for captive use due to occurrence of uncontrollable events
For more information please see below link:


