Petition of the PPA for the development of 450 MW ISTS connected Wind-Solar Hybrid power project, entered between Adani Solar Energy Jaisalmer One Private Limited and SECI – EQ
Petition of the PPA for the development of 450 MW ISTS connected Wind-Solar Hybrid power project, entered between Adani Solar Energy Jaisalmer One Private Limited and SECI
For more information please see below link:


