1. Home
  2. Tenders
  3. PRE-BID TIE UP FOR DESIGN, SUPPLY, I and C AND 5 YEARS COMPREHENSIVE MAINTENANCE OF WHITE LED W-LED BASED OFF-GRID SOLAR HOME LIGHTING SYSTEMS FOR ELECTRIFICATION OF UE HHs IN VILLAGES AND DHANIES UNDER SAUBHAGYA SCHEME DURING 2018-19 IN RAJASTHAN
PRE-BID TIE UP FOR DESIGN, SUPPLY, I and C AND 5 YEARS COMPREHENSIVE MAINTENANCE OF WHITE LED W-LED BASED OFF-GRID SOLAR HOME LIGHTING SYSTEMS FOR ELECTRIFICATION OF UE HHs IN VILLAGES AND DHANIES UNDER SAUBHAGYA SCHEME DURING 2018-19 IN RAJASTHAN

PRE-BID TIE UP FOR DESIGN, SUPPLY, I and C AND 5 YEARS COMPREHENSIVE MAINTENANCE OF WHITE LED W-LED BASED OFF-GRID SOLAR HOME LIGHTING SYSTEMS FOR ELECTRIFICATION OF UE HHs IN VILLAGES AND DHANIES UNDER SAUBHAGYA SCHEME DURING 2018-19 IN RAJASTHAN

10
0
Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *