110
0

Ministry of New & Renewable Energy

Programme/Scheme wise Physical Progress in 2018-19 & Cumulative upto June, 2018 
SectorFY- 2018-19Cumulative
Achievements
Target Achievement (April-June 2018)(as on 30.06.2018)
I.   GRID-INTERACTIVE POWER (CAPACITIES IN MW)
Wind Power4000.00148.4834293.48
Solar Power – Ground Mounted10000.001215.5721803.42
Solar Power – Roof Top1000.00155.771219.41
Small Hydro Power250.007.44493.20
Biomass (Bagasse) Cogeneration)250.000.008700.80
Biomass (non-bagasse) Cogeneration)/Captive Power100.0014.00676.81
Waste to Power2.000.00138.30
Total15602.001541.2271325.42
II.  OFF-GRID/ CAPTIVE POWER    (CAPACITIES IN MWEQ)
Waste to Energy18.000.00172.15
Biomass Gasifiers1.000.00163.37
SPV Systems200.0066.44737.85
Total219.066.441073.37
III.  OTHER RENEWABLE ENERGY SYSTEMS

Tentative State-wise break-up of Renewable Power target to be achieved by the year 2022 (Posted on 30.03.2015)