Tenders March 17, 2020 Anand Gupta 0 PROVIDING AND ERECTING ROOFTOP OFF/ ON GRID SOLAR SYSTEM AT DIST BEED 0 00 0 0 more now viewing PROVIDING AND ERECTING ROOFTOP OFF/ ON GRID SOLAR SYSTEM AT DIST BEED March 17, 2020 Anand Gupta now playing NTPC Ltd issue Tender for Supply of Solar PV Modules for 1.2 GW Solar PV Projects at NTPC Rel Khavda RE Park-South Block in Rann of Kutch Gujarat - EQ March 17, 2020 Anand Gupta now playing NTPC Ltd issue Tender for Supply and Installation of SVG Package for Reactive Power Compensation at Devikot Solar PV Station - EQ March 17, 2020 Anand Gupta now playing CPWD issue Tender for SITC of Grid Connected Rooftop Solar Power Plant at Composite Regional Centre (CRC) Rajnandgaon (C.G.) - EQ March 17, 2020 Anand Gupta now playing How governments can best support consumers during this energy crisis - EQ March 17, 2020 Anand Gupta now playing Avaada Group Surpasses 17.7 GWp Renewable Portfolio; Over 7.2 GWp Operational and ~ 10.5 GWp Under Construction - EQ March 17, 2020 Anand Gupta now playing Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation - EQ March 17, 2020 Anand Gupta now playing Petition of the CERC (Conduction of Business) Regulations for Bihar State Power Holding Company Limited and PTC India Limited - EQ March 17, 2020 Anand Gupta now playing Petition of the CERC (Procedure, Terms and Conditions for Grant of Trading Licence and other Related Matters) Regulations, 2020 - EQ March 17, 2020 Anand Gupta now playing CB issue Tender for Supply and Installation of Solar Power System - EQ March 17, 2020 Anand Gupta now playing PIXON Receives ALMM Approval for 2.391 GW Solar Module Manufacturing Capacity - EQ March 17, 2020 Anand Gupta PROVIDING AND ERECTING ROOFTOP OFF/ ON GRID SOLAR SYSTEM AT GP WADKHEL TQ PARLI DIST BEED Tender Value In Rs.: 3,09,781 For more information please see below link: 00 0 0 previous Completion of incomplete left over works for provision of 2 MW Solar Power Plant at Jalipa under GE Army Barmer next 20 KW GRID CONNECTED SOLAR PV PLANT IN EXTENSION WITH EXISTING 40 KW PV PLANT AT ZILHA PARISHAD Anand Gupta Editor - EQ Int'l Media Network Related Posts NTPC Ltd issue Tender for Supply of Solar PV Modules for 1.2 GW Solar PV Projects at NTPC Rel Khavda RE Park-South Block in Rann of Kutch Gujarat – EQ May 12, 2026 Anand Gupta 0 NTPC Ltd issue Tender for Supply and Installation of SVG Package for Reactive Power Compensation at Devikot Solar PV Station – EQ May 12, 2026 Anand Gupta 0 CPWD issue Tender for SITC of Grid Connected Rooftop Solar Power Plant at Composite Regional Centre (CRC) Rajnandgaon (C.G.) – EQ May 11, 2026 Anand Gupta 0 LEAVE YOUR COMMENT Cancel replyYour email address will not be published. Required fields are marked *