Public hearing on petition filed by M/s BALCO for determination of energy charge rate for the FY 2020-21 for its 1200 MW (4x300MW) Coal Based Power Project – EQ Mag
Public hearing on petition filed by M/s BALCO for determination of energy charge rate for the FY 2020-21 for its 1200 MW (4x300MW) Coal Based Power Project.
For more information please see below link:


