Tenders March 13, 2021 Anand Gupta 0 REIL Floats Tender to Supply 140000 Nos Solar Cells 0 00 0 0 more now viewing REIL Floats Tender to Supply 140000 Nos Solar Cells March 13, 2021 Anand Gupta now playing NTPC Ltd issue Tender for Supply of Solar PV Modules for 1.2 GW Solar PV Projects at NTPC Rel Khavda RE Park-South Block in Rann of Kutch Gujarat - EQ March 13, 2021 Anand Gupta now playing NTPC Ltd issue Tender for Supply and Installation of SVG Package for Reactive Power Compensation at Devikot Solar PV Station - EQ March 13, 2021 Anand Gupta now playing CPWD issue Tender for SITC of Grid Connected Rooftop Solar Power Plant at Composite Regional Centre (CRC) Rajnandgaon (C.G.) - EQ March 13, 2021 Anand Gupta now playing How governments can best support consumers during this energy crisis - EQ March 13, 2021 Anand Gupta now playing Avaada Group Surpasses 17.7 GWp Renewable Portfolio; Over 7.2 GWp Operational and ~ 10.5 GWp Under Construction - EQ March 13, 2021 Anand Gupta now playing Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation - EQ March 13, 2021 Anand Gupta now playing Petition of the CERC (Conduction of Business) Regulations for Bihar State Power Holding Company Limited and PTC India Limited - EQ March 13, 2021 Anand Gupta now playing Petition of the CERC (Procedure, Terms and Conditions for Grant of Trading Licence and other Related Matters) Regulations, 2020 - EQ March 13, 2021 Anand Gupta now playing CB issue Tender for Supply and Installation of Solar Power System - EQ March 13, 2021 Anand Gupta now playing PIXON Receives ALMM Approval for 2.391 GW Solar Module Manufacturing Capacity - EQ March 13, 2021 Anand Gupta NIT for rate contract for supply of DCR Solar Cell 4.67 Watt The last date to submit the bids is March 18, 2021 For more information please see below link: Download [162.39 KB] tags: RAJASTHAN ELECTRONICS & INSTRUMENTS LIMITED REIL Solar Cells 00 0 0 previous Conversion Of Existing Non Functional Off Grid Solar Power Plant Of Capacity 2x33 Kw Into 2x33kw Grid Connected Solar Power Plant next REIL Floats Tender to Supply 150000 Nos Solar Cells Anand Gupta Editor - EQ Int'l Media Network Related Posts NTPC Ltd issue Tender for Supply of Solar PV Modules for 1.2 GW Solar PV Projects at NTPC Rel Khavda RE Park-South Block in Rann of Kutch Gujarat – EQ May 12, 2026 Anand Gupta 0 NTPC Ltd issue Tender for Supply and Installation of SVG Package for Reactive Power Compensation at Devikot Solar PV Station – EQ May 12, 2026 Anand Gupta 0 CPWD issue Tender for SITC of Grid Connected Rooftop Solar Power Plant at Composite Regional Centre (CRC) Rajnandgaon (C.G.) – EQ May 11, 2026 Anand Gupta 0