1. Home
  2. Tenders
  3. Stakeholders Consultation Meeting: Tender for 20 MW (AC) Solar PV Power Plant
Stakeholders Consultation Meeting: Tender for 20 MW (AC) Solar PV Power Plant

Stakeholders Consultation Meeting: Tender for 20 MW (AC) Solar PV Power Plant

0
0

Stakeholders Consultation Meeting: Tender for 20 MW (AC) Solar PV Power Plant (50 MWp DC) with 20 MW / 50 MWh BESS at Phyang, Leh, UT of Ladakh, India

Stakeholders Consultation Meeting: Design, Engineering, Supply, Construction, Erection, Testing, Commissioning and O&M of 20 MW (AC) Solar PV Power Plant (50 MWp DC) with 20 MW / 50 MWh Battery Energy Storage System having 10 years plant O&M at Phyang, Leh, UT of Ladakh, India

SECI is organizing a Stakeholders Consultation Meeting regarding its upcoming project for the Design, Engineering, Supply, Construction, Erection, Testing, Commissioning and O&M of 20 MW (AC) Solar PV Power Plant (50 MWp DC) with 20 MW / 50 MWh Battery Energy Storage System having 10 years plant O&M at Phyang, Leh, UT of Ladakh, India. Due to current pandemic situation on account of COVID19, the meeting shall be conducted online as per the details mentioned below:

Please join the meeting on 04-01-2021, 14:00, India Standard Time (UTC+5:30), by clicking on the below link:

https://teams.microsoft.com/l/meetup-join/19%3af7db1e6ae3084acfa165c20797e8cf34%40thread.tacv2/1609308273700?context=%7b%22Tid%22%3a%226ba91649-6082-4e2e-861b-ab47c044c9b6%22%2c%22Oid%22%3a%229727fc22-9847-4852-8d36-5e941aa7597c%22%7d

The discussion aims to brief the various stakeholders about the Hybrid Project along with the wide spread out reach of the Project. Prospective bidders are kindly requested to make themselves available online for the said meeting as per the above-mentioned schedule. Maximum 02 (Two) persons from the respective Bidder company are allowed to attend the Meeting.

Prospective bidders are required to send in their confirmation mail at sandeeprana@seci.co.in to attend the Stakeholders Consultation Meeting latest by 03/01/2021.

Bidders are required to kindly be updated through SECIs website www.seci.co.in for any further updates regarding this Stakeholders meeting.

Source: seci
Anand Gupta Editor - EQ Int'l Media Network