Supply, Installation and commissioning 18 nos solar LED high mastlighting at different Locations
28
0
Supply, Installation and commissioning 18 nos solar LED high mastlighting at different Locations at Farakka AND MGR affected area Jharkhand under NTPC CSR Scheme at NTPC Farakka
For more information please see below link:
Related posts:
- Supply, Installation and Commissioning of Electrochemical Capacitance Voltage (ECV) Profiler at National Institute of Solar Energy, Gurugram, Haryana
- DESIGN, SUPPLY, ERECTION, TESTING, COMMISSIONING & O&M OF 900 KWP ROOFTOP SOLAR PV PANELS INTEGRATED WITH GRID AT BGTPP
- Design, Engineering, Supply, Construction, Erection, Testing and Commissioning including 10 Years Plant O and M of 2X1.5 MW -AC- Solar PV Power Plant with BESS at Tangtse and Durbuk in Leh district of J and K
- Supply,installation and commissioning of Solar Photovoltaic Power Generation Plant with Battery back-up followed by 5 years comprehensive maintenance in the districts of Murshidabad and Malda
tags:
Installation and commissioning 18 nos solar LED high mastlighting at different Locations Supply