Supplying, installation and commissioning of solar steam cooking facility In 09 Hostels
0
0
Supplying installation and commissioning of solar steam cooking facility to ‘B’ block mess (for 3300 students) In 09 Hostels
For more information please see below link:
Related posts:
- IMPLEMENTATION OF 1000MW GRID CONNECTED ROOF TOP SOLAR PV SYSTEM SCHEME FOR GOVERNMENT BUILDINGS IN DIFFERENT STATES / UNION TERRITORY OF INDIA UNDER CAPEX / RESCO MODEL
- Solar Pump Systems
- Const. of Solar Energy based MWSS SC ST Tola with 3 M High galvanized tubular Steel structure staging for mounting HDPE water storage Tank having Capacity 5000 L in Existing T W
- Supply, Installation and Commissioning of Electrochemical Impedance Spectroscopy EIS with solar simulator