500 MW Grid Connected Solar Photovoltaic Power Projects (Phase II-R) September 17, 2018 Anand Gupta 0001.84K Featured 500 MW Grid Connected Solar Photovoltaic Power Projects (Phase II-R) For more information please see below link: Read more National Workshop on RE integration through ESS Phase-II to be held on 30.04.2026 in hybrid mode – reg. – EQ