1. Home
  2. Tag "7 MW"

NVVN issue Tender for Development of 7 MW Rooftop Solar Power Project for Nalco at Angul and Damanjodi – EQ

Summary: —- **1. General Information** – **Project Title:** Development of 7,000 kW (7 MW) Rooftop Solar Power Project for NALCO at Angul & Damanjodi – **Bid Document No.:** NVVN/C&M/RE-431/2025-26 – **Issuing Agency:** NTPC Vidyut Vyapar Nigam Limited (NVVN) – a wholly owned subsidiary of NTPC Limited – **Owner/Employer:** NALCO Limited – **Project Management Consultant (PMC):** […]

SECI issue Tender for BoS Tender for Setting up of grid connected 700 MW Ground mounted Solar PV plant at Radhanesda, Gujarat – EQ

Petition for Adoption of the Tariff and approval of PPA for the procurement of 7 MW for meeting its Renewable Purchase Obligation – EQ

Summary: — ## Case Background * **Petitioner**: *Nidar Utilities Panvel LLP (NUPLLP)* – deemed distribution licensee for Panvel SEZ. * **Respondent**: *PTC India Limited*. * **Relief sought**: Adoption of tariff and approval of a **short-term Power Purchase Agreement (PPA)** for **7 MW round-the-clock (RTC) renewable energy** for **1 year (Sep 2025 – Aug 2026)**. — […]

Petition of the CERC (Connectivity and General Network Access to inter- State Transmission System) Regulations of 500 MW installed capacity Hybrid Renewable Energy Project – EQ

Solarium Green Secures 7 MW Rooftop Solar Deal with NVVN to Boost Clean Energy – EQ

In Short : Solarium Green has won a 7 MW rooftop solar contract from NVVN, boosting India’s renewable energy push. The project will deploy solar installations across multiple locations, cutting carbon emissions and reducing electricity costs. This aligns with India’s 500 GW non-fossil fuel goal, promoting decentralized clean energy and sustainability for businesses and institutions. […]

BHEL Delivers Strong Turnaround with Sharp Profit Surge in Q3 FY26 – EQ

Petition for the procurement of 7 MW Round the Clock (RTC) power for a period of 4 months i.e. from 1 August 2024 to 30 November 2024 – EQ

Petition for the procurement of 7 MW Round the Clock (RTC) power for a period of 4 months i.e. from 1 August 2024 to 30 November 2024 For more information please see below link:

Petition of the CERC (Connectivity and General Network Access to inter- State Transmission System) Regulations of 500 MW installed capacity Hybrid Renewable Energy Project – EQ

CMPDI Issue Tender for Supply of grid connected SPP of capacity 7 MW (AC) (5 MW Ground and 2 MW Floating) with 40 percent DC overload capacity, at Wani Area, WCL – EQ

CMPDI Issue Tender for Supply of grid connected SPP of capacity 7 MW (AC) (5 MW Ground and 2 MW Floating) with 40 percent DC overload capacity, at Wani Area, WCL For more information please see below link:

SECI issue Tender for BoS Tender for Setting up of grid connected 700 MW Ground mounted Solar PV plant at Radhanesda, Gujarat – EQ

Waaree Renewables Technologies receives LoA for 7 MW solar power project – EQ Mag

Waaree Renewables Technologies announced that the company has signed Letter of Award (LoA) with one of India’s leading construction company, for the execution of Engineering, Procurement, Construction, and Commissioning (EPCC) of a solar power project of 7 MWp DC capacity for their Captive requirement along with three years of Operation & Maintenance work. Source: capital […]

Executive Director meets with King and Prime Minister of Sweden to discuss energy priorities – EQ

WBDPL Issue Tender for Supply of 7 MW Phase I Grid Connected Ground Mounted Solar Photovoltaic Power Plants at Durgapur Projects Limited – EQ Mag Pro

WBDPL Issue Tender for Supply of 7 MW Phase I Grid Connected Ground Mounted Solar Photovoltaic Power Plants at Durgapur Projects Limited. For more information please see below link:

SECI issue Tender for BoS Tender for Setting up of grid connected 700 MW Ground mounted Solar PV plant at Radhanesda, Gujarat – EQ