Result: Request for Selection of Green Ammonia Producers for Production and Supply of Green Ammonia in India through Cost Based Competitive Bidding under SIGHT Scheme (Mode-2A-Tranche-I) – EQ

Summary: — ## 📌 Overview * **RfS No.:** SECI/C\&P/MI/00/0002/2024-25 (07.06.2024) * **Scheme:** SIGHT – Mode-2A (Cost-based competitive bidding) * **Techno-commercial bids opened:** 15.07.2025 * **Financial bids opened:** 29.07.2025 * **e-Reverse Auctions:** Aug 2025 * **Letters of Award issued:** 22–04 Sept 2025 **Total cumulative capacity quoted:** \~25.22 lakh MT of Green Ammonia (GA). **Major bidders:** ACME, […]

PM-KUSUM Extended to 2027: A Major Boost for Decentralized Solar Growth, Investor Confidence, and Rural Electrification – EQ

NTPC Invites Bidding for Supply of 60 KWp Solar PV at Buildings at NTPC Bongaigaon

NTPC Limited has issued a Notice Inviting Tender (NIT) for the supply of 60 KWp Solar PV at various buildings at NTPC Bongaigaon. NTPC has invited online bids on Single Stage Two envelop Basis from eligible bidders for the package named Supply, Erection, Testing, Commissioning and O&M of 60 KWp Roof-Top Grid connected Solar PV […]

ITI Ltd issue Tender for Establishment of Automatic SPV Module Manufacturing Line on a Turnkey Basis at ITI Limited Naini Prayagraj – EQ

CPWD Chandigarh Invites Bidding for 100 KWP Solar PV Generation System

The Executive Engineer, CPWD Chandigarh on behalf of the President of India has invited online Percentage Rate Bids through E-tendering process for ‘Providing Solar Photo Voltaic Generation System of 100kWP at Census of India, Sector 19, Chandigarh’. The two bid system including Part I Eligibility or Pre-Qualification Bid and Part II Price Bid, will be […]

ITI Ltd issue Tender for Establishment of Automatic SPV Module Manufacturing Line on a Turnkey Basis at ITI Limited Naini Prayagraj – EQ

Power procurement by Distribution Licensee from Bagasse based Co-generation plants

In the matter of: Power procurement by Distribution Licensee from Bagasse based Co-generation plants and allied issues relating to captive use and third party sale For more information please see below link:

Petition for Adoption of tariff of 1500 MW Solar PV Power Projects Connected to the ISTS of the Ministry of Power, Government of India as amended from time to time – EQ

Standard bidding document for discoms not to reform power sector but to privatize:AIPEF

It provides guidelines for states who want to offer their electricity distribution utilities to private players to improve operational efficiency and finances New Delhi: The All India Power Engineers Federation (AIPEF) on Friday said the draft standard bidding document for discoms circulated by the power ministry is not to reform the sector but to privatise […]

IIT Indore Advances Sustainability with Solar Park, New Substation and Cutting-Edge Research Infrastructure – EQ

Supply of 5 MW Multi crystalline Solar PV Modules in various districts of Maharashtra

  Supply of 5 MW Multi crystalline Solar Photovoltaic Modules min. 335 Wp made from 72 Nos. of Silicon solar cells to be supplied at different substations in various districts of Maharashtra For more information please see below link:

ITI Ltd issue Tender for Establishment of Automatic SPV Module Manufacturing Line on a Turnkey Basis at ITI Limited Naini Prayagraj – EQ

In the matter of: Petition under Section 63 read with Section 86 (1) (b) of the Electricity Act, 2003 for adoption of tariff discovered through Competitive Bidding process

In the matter of: Petition under Section 63 read with Section 86 (1) (b) of the Electricity Act, 2003 for adoption of tariff discovered through Competitive Bidding process. For more information please see below link:

Petition for Adoption of tariff of 1500 MW Solar PV Power Projects Connected to the ISTS of the Ministry of Power, Government of India as amended from time to time – EQ