Engineering Procurement Construction EPC inclusive of 1 Year Comprehensive Operation and Maintenance of 45KWp On Grid SPV System Roof Mounted Captive Solar Power Project at Indian Oil Marketing Division, Patna Terminal Dist.-Patna Bihar For more information please see below link:
BREDA Issue Tender For Supply of Hybrid Rooftop Solar Power Plants With Remote Monitoring Including Net Metering For 1 MW Capacity Under CAPEX Model in Bihar. For more information please see below link:
Bihar’s first floating solar power plant is being built in the Kadirabad locality of Darbhanga. The state government has selected two model cities for the project with one being the Darbhanga solar plant. The solar power grid of about 2 MW generation capacity will be built over the pond which is located in the area. […]
According to the power demand data published by the National Load Dispatch Centre, the national peak power demand was at 183 GW while the peak demand and power consumption registered close to 40 per cent YoY growth on a weak base. New Delhi: Continuing its exceptional performance during the last fiscal, the electricity market at […]
All these states – which have high agricultural and residential power consumption – consumed more electricity than in the previous year, though India’s annual power demand fell for the first time in at least 35 years in 2020/21. CHENNAI: India’s less industrialized states have led a recovery in electricity demand that began in September, a […]
The ‘smart prepaid meter’ scheme implemented in Bihar will now be extended nationwide. Union Finance Minister Nirmala Sitharaman proposed to introduce the meter throughout the country in the Budget presented in Parliament on Monday. Patna : The ‘smart prepaid meter’ scheme implemented in Bihar will now be extended nationwide. Union Finance Minister Nirmala Sitharaman proposed […]
Outright Purchase -Lease for 28 Years of up to 1250 Acres of Land with all requisite statutory clearances of purchased/leased land for setting up Solar Power Project(s) in the State of Bihar, inclusive of chain link fencing around the periphery of the Land. The last date to submit the bids is February 15, 2021 Tender […]
New Delhi: ITC Limited has set itself the target to meet 100% of purchased grid electricity requirements from renewable sources by 2030. In line with its philosophy of ‘Responsible Competitiveness’, the Company has adopted a low carbon growth strategy which encompasses a large renewable energy footprint. At present, ITC meets over 40% of its electrical […]
Date and Time Extension for Ground Mounted 250 MW Tender The last date to submit the bids is January 22, 2021 For more information please see below link: Date and Time Extension for Ground Mounted 250 MW Tender
New Delhi: TP Renewable Microgrid (TPRMG), a wholly owned subsidiary of Tata Power, on Monday announced that it had inaugurated its first 5kW Bio-gas generating plant at Kamalpura (Basaitha) village in Muzaffarpur district of Bihar. The plant commenced operations on ‘National Energy Conservation Day’, on December 14. TPRMG constructed this plant in association with Grassroots […]