Summary: —- ### Key Discussions 1. **PTCC Process Overview** (Presented by CEA): – PTCC ensures power systems do not interfere with telecom/signaling lines via electromagnetic induction. – Legal basis: Section 160 of the Electricity Act, 2003. – Risks include induced voltage, earth potential rise (EPR), and threats to railway signaling & BSNL copper cables. 2. […]