1. Home
  2. Tag "General Network Access"

Petition of CERC (Connectivity and General Network Access to the Inter-State Transmission System) Regulations of the land required for grant of final connectivity – EQ

Summary: — ### Reliefs Sought by SUCRL (Main Petition & IAs) 1. Relax timeline for land document submission – allow **12 months from final grant** or **12 months from issuance of coordinates** (instead of 18 months from in‑principle grant). 2. Alternatively, permit land document submission **18‑24 months before start date (31.12.2029)**. 3. Transfer/reallocate connectivity to […]

How governments can best support consumers during this energy crisis – EQ

Petition of the CERC (Connectivity and General Network Access to the interstate Transmission System) (Third Amendment) Regulations of Hybrid Power Project – EQ

Summary: — ## Key Business Facts | Parameter | Detail | |———–|——–| | **Petitioner** | VEH Jayin Renewables Private Limited (VJRPL) | | **Respondent** | Central Transmission Utility of India Limited (CTUIL) | | **Total Project Capacity** | 151.8 MW (Hybrid Project) | | **Additional Capacity Sought** | 45 MW (Solar) | | **Connectivity Point** […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations of VSUPL – EQ

Summary: — ## Key Business Details | Parameter | Detail | |———–|——–| | **Petitioner** | VEH Saur Urja Private Limited (VSUPL) – Solar power generator | | **Respondent** | Central Transmission Utility of India Limited (CTUIL) | | **Project Capacity** | 81.9 MW (verge of commissioning) | | **Original Connectivity Granted** | 162.3 MW (later […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition of the CERC (Conduct of Business) and (Connectivity and General Network Access to the Inter-State Transmission System) (Third Amendment) Regulations – EQ

Summary: —- **Key Parties:** – **Petitioner:** Indosol Solar Private Limited (ISPL), a solar power generation company. – **Respondent:** Central Transmission Utility of India Limited (CTUIL), the central transmission utility. **Procedural Status & Key Developments:** 1. **Compliance Filed:** The Petitioner’s counsel informed the Commission that ISPL has complied with previous directives. A compliance affidavit dated February […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition of the CERC (Connectivity and General Network Access to inter- State Transmission System) Regulations of 500 MW installed capacity Hybrid Renewable Energy Project – EQ

Summary: — ### **1. Executive Summary** In the hearing dated **15 January 2026**, the Central Electricity Regulatory Commission (CERC) considered Serentica Renewables India Private Limited’s (SRIPL) petition seeking retention and extension of its **400 MW connectivity** at the Solapur substation. The petition arises due to delays in commissioning its **500 MW Hybrid Renewable Energy Project**, […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition of the CERC (Connectivity and General Network Access to the interstate Transmission System) Regulations, 2022 – EQ

Summary: — ### **1. KEY ARGUMENTS BY PETITIONERS** 1. **Current Compliance Status:** * **All three Petitioners** have submitted **Conn-BG 1**. * **Petitioner No. 1 (Lead Generator)** has also submitted **Conn-BG 2**. * **Petitioners 2 & 3** were initially recorded as requiring **”Nil” Conn-BG 2** in their in-principle connectivity approvals. 2. **Post-Amendment Demand by CTUIL:** * […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition of the in-principle grant of connectivity of the CERC (Connectivity and General Network Access to the inter-state transmission system) Regulations – EQ

Summary: — ### **1. SUBJECT OF THE PETITION** * **Petitioner:** Datta Power Infra Private Limited (DPIPL) * **Respondent:** Central Transmission Utility of India Limited (CTUIL) * **Relief Sought:** Interim directions to **restrain CTUIL** from taking **coercive actions** against DPIPL, including: * Revocation of in-principle connectivity grant. * Encashment of connectivity bank guarantees. * **Legal Basis:** […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

In the matter of Removal of Difficulties in giving effect to certain provisions of CERC (Connectivity and General Network Access to the ISTS) Regulations, 2022 – EQ

Summary: — # **1. Background** The Central Electricity Regulatory Commission (CERC) considered multiple representations from Renewable Energy Developers (RE Developers) and industry associations regarding operational challenges arising from the newly introduced framework of *Solar Hour Access* and *Non-Solar Hour Access* under the Third Amendment to the GNA Regulations. The Commission examined issues raised and issued […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations to construct the dedicated transmission infrastructure – EQ

Summary: — ### 🔹 **Subject Matter** Petition filed under **Section 79(1)(f)** of the *Electricity Act, 2003* read with **Regulation 42** of the *CERC (Connectivity and General Network Access to the ISTS) Regulations, 2022*, seeking a **limited modification** in the *in-principle grant of connectivity* issued by **CTUIL**. — ### 🔹 **Parties** * **Petitioner:** Halvad Renewables Private […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition of the CERC (Connectivity and General Network Access to the Inter-State Transmission System) Regulations, 2022 – EQ

Summary: — ## ⚖️ **Petition Summary** * **Petition No.**: 657/MP/2025 * **Filed By**: JSW Renew Energy Five Limited (JREFL) * **Respondents**: Central Transmission Utility of India Ltd. (CTUIL) and others * **Date of Hearing**: 17 July 2025 * **Forum**: CERC, New Delhi — ## 📌 **Legal Basis** * **Filed under**: * Section **79(1)(c)** and **79(1)(f)** […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ