1. Home
  2. Tag "INDUSTRIAL WASTE BASED POWER PROJECTS"

Commission passed order in the matter of Suo-Moto Determination of Variable Cost for existing Biomass, Bagasse and Industrial waste based power projects in the State of Telangana

Commission passed order in the matter of Suo-Moto Determination of Variable Cost for existing Biomass, Bagasse and Industrial waste based power projects in the State of Telangana, and having Power Purchase Agreements with the Distribution Licensees, for the FY 2019-20. For more information please see below link:

Petition for determination of tariff for Nabinagar Thermal Power Project (1000 MW) for the period from 1.4.2019 to 31.3.2024. Bhartiya Rail Bijlee Company Limited – EQ

IN THE MATTER OF: DETERMINATION OF VARIABLE COST FOR EXISTING BIOMASS, BAGASSE AND INDUSTRIAL WASTE BASED POWER PROJECTS

IN THE MATTER OF: DETERMINATION OF VARIABLE COST FOR EXISTING BIOMASS, BAGASSE AND INDUSTRIAL WASTE BASED POWER PROJECTS IN THE STATE OF TELANGANA, AND HAVING POWER PURCHASE AGREEMENTS WITH THE DISTRIBUTION LICENSEES, FOR THE PERIOD FROM 01.04.2019 TO 31.03.2020 For more information please see below link:

Petition for determination of tariff for Nabinagar Thermal Power Project (1000 MW) for the period from 1.4.2019 to 31.3.2024. Bhartiya Rail Bijlee Company Limited – EQ