Commission passed order in the matter of Suo-Moto Determination of Variable Cost for existing Biomass, Bagasse and Industrial waste based power projects in the State of Telangana
0
0
Commission passed order in the matter of Suo-Moto Determination of Variable Cost for existing Biomass, Bagasse and Industrial waste based power projects in the State of Telangana, and having Power Purchase Agreements with the Distribution Licensees, for the FY 2019-20.
For more information please see below link:
Related posts:
- Commission passed order in the matter of Suo-Moto Determination of Generic Tariff for electricity generated from RDF based power projects
- IN THE MATTER OF: DETERMINATION OF VARIABLE COST FOR EXISTING BIOMASS, BAGASSE AND INDUSTRIAL WASTE BASED POWER PROJECTS
- In the matter of: TSERC (Demand Side Management) Regulations, 2020
- TSERC: Determination of Pre-Fixed Levelized Tariff under Component A of PM KUSUM Scheme
tags:
BAGASSE biomass DETERMINE DISTRIBUTION LICENSEES electricity INDUSTRIAL WASTE BASED POWER PROJECTS PPA Suo moto TELANGANA TSERC